Procurement intelligence with design-in visibility.
Semitrical surfaces what semiconductor suppliers disclose in their own filings — so procurement teams and their suppliers work from the same facts, and engineering teams make design-in decisions with visibility into whether that supplier is still investing in the technology their programme depends on.
What Semitrical does
We read every filing, earnings transcript, and investor presentation across our supplier corpus and translate it into negotiation intelligence, supply resilience signals, and technology investment visibility — for the people who design components in and the people who then have to buy them. Engineering and procurement are making the same decision from opposite ends of the timeline. Semitrical gives both teams the same picture.
About this document
Every page that follows is a sample of platform output — what Semitrical produces from supplier filings, earnings transcripts, and investor presentations, combined where relevant with a buyer's own spend data. The intelligence shown is real, drawn from the corpus as at September 2026. The spend figures on page 7 are illustrative.
Sample outputs — pages 3 to 7
pg 3
Capital investment signal
Supplier plant investment vs. depreciation
Which suppliers are growing their plant base and which are letting it shrink — the single ratio that points forward on part availability.
pg 4
Technology investment signal · Memory
Memory: who is funding the next node
LPDDR6, UFS, HBM. Which suppliers are investing at scale for automotive-grade supply — and which are harvesting current capacity.
pg 5
Technology investment signal · Analog
Analog & Power: technology shifts in the filings
SiC, GaN, SDV/zonal. What supplier filings and transcripts say about technology priorities — and where capacity is being redirected.
pg 6
Negotiation intelligence
Power semiconductor leverage by product
SiC vs IGBT. Three suppliers, three financial positions, three very different negotiating conversations — grounded in last quarter's filings.
pg 7
Spend + corpus output
Supplier leverage scores and part-level posture
What the platform produces when corpus intelligence meets a buyer's actual spend data — leverage scores, negotiation posture, and watch triggers per part.
pg 8
Get started
Supplier diagnostic
Names only. No contract. No NDA. We run your shortlisted suppliers through the corpus and deliver a structured report the same week.
Who uses it
Engineering teams
Is this supplier still investing in the technology my programme depends on?
Before a design-in is finalised, know whether the supplier is funding the next node, maintaining capacity for this product line, and whether their strategic roadmap still treats this technology as a priority — or is quietly moving capital elsewhere.
Procurement teams
What does their financial position say about my negotiating leverage — right now?
When a supplier sends a price increase letter, their last two earnings calls already say whether to accept it, discuss it, or use it to agree supply commitments. Semitrical reads the filings so your team and your supplier start from the same facts.
Sample output · Capital investment signal
The design-in is the procurement decision.
When engineering commits to a part, procurement inherits the supplier behind it — their financial health, their technology priorities, and their ability to supply that part for 10 to 15 years. The roadmap describes what a supplier intends to build. The filing tells you whether the capital is there to build it, and whether this technology is still where they are putting it.
Two documents. One supplier. Very different information.
📋
The roadmap
Nodes, densities, capacity plans, product generations. Presented at every supplier review. Describes what they intend to build. Does not say whether the investment is funded — or whether this product line is still a strategic priority.
📂
The filing
Capital spending relative to what the existing plant costs to maintain. Free cash flow. Management commentary on which segments and technologies they are prioritising. Filed with regulators every quarter. Rarely opened by engineering or procurement.
Capital spending vs. plant depreciation — one ratio that points forward
What each supplier is doing with their plant base — FY2025
Think of this as a maintenance dial. At 1.0× a supplier is spending exactly enough to replace what wears out — their factory stays the same size. Above 1.0× they are adding capacity or upgrading to a newer process. Below 1.0× their factory is gradually shrinking. A supplier spending below replacement for several consecutive years is signalling something about the long-term availability of parts from that plant.
MEMORY SUPPLIERS
SK Hynix
2.17×
Building hard. Largest single-year capex in the group.
Micron
1.92×
Heavy investment. ~$8.3B plant depreciation base.
Nanya
0.96×
Replacement only. Revenue 30% below own peak.
Kioxia
~0.8×
Capex 12% of revenue vs 40% in 2022.
Winbond
0.53×
Half of replacement. Prior build complete.
ANALOG / POWER SUPPLIERS
Texas Instr.
2.37×
5 years above 2×, through the downturn. Business-funded.
ADI
1.31×
Above replacement. FCF 38.8% — most comfortable.
Infineon
1.19×
Dresden M4 opened July 2026. Growing plant base.
STM
1.05×
Big build 2022 at 3.17×. Now at replacement. Rev 31.7% below peak.
NXP
0.71×
Lowest in six years. Plant base shrinking.
Source: company annual filings FY2025. Each company at its own latest fiscal year-end. Samsung excluded — semiconductor division capex not separately reported. Kioxia: D&A used as proxy.
Below 1.0× is the clearer signal. A plant base shrinking faster than it is replaced has no positive interpretation for a buyer with a 15-year programme. Above 1.0× is more nuanced — it can be new capacity, a process upgrade, or the same plant rebuilt on a newer node. The ratio shows direction. The transcript tells you which.
Sample output · Technology investment signal · Memory
Memory: which suppliers are funding the next node
LPDDR6 is in sampling. LPDDR5X is in automotive qualification. UFS 4.1 is ramping. The engineering question is not which technology is next — it is which suppliers are investing to build it at automotive grade, at scale, for the decade your programme needs. The filings separate the two groups clearly.
DRAM content — what the autonomy transition means in volume terms
DRAM requirement by vehicle autonomy level
Average car today (<L2 ADAS)
~16GB
L4 autonomous vehicle
>300GB
Source: Micron Q2 FY26 investor presentation, Mar 18 2026. Micron Q2 FY26
Supplier signals — filings and transcripts Q3 FY25–Q2 FY26
Micron
LPDDR · UFS · HBM · Auto DRAM
Capex ÷ plant dep1.92×
Auto revenueRecord Q2 FY26
Sampling 1γ LPDDR6 to OEM and ecosystem partners. First automotive-grade 1γ LPDDR5 DRAM shipped. ASIL-rated LPDDR5X and UFS 4.1 have secured "billions of dollars in design wins." Investing in Manassas VA fab for long-lifecycle supply. Micron Q1/Q2 FY26
SK Hynix
LPDDR · HBM · NAND
Capex ÷ plant dep2.17×
FCF margin FY2526.6%
Completed development of industry's first 1c-nm LPDDR6 in Q1 FY26. 33% faster data processing and >20% better power efficiency vs LPDDR5X. Full-scale supply planned H2 2026. CapEx increasing significantly in 2026 vs 2025. Hynix Q1 FY26
Capex % of revenue12.1% (FY25)
vs. FY22 peakWas 39.8%
Revenue at record high FY25 but capital spending at its lowest share in six years. 8th-gen BiCS FLASH in high-volume production. 10th-gen in development. UFS for automotive a stated strategic focus. FY26 gross capex guided 450 billion yen. Kioxia Q3/Q4 FY25 · Q1 FY26
Nanya
Specialty DRAM · DDR4
Capex ÷ plant dep0.96×
Revenue vs own peak−30.3%
Revenue 30.3% below its own six-year peak in the same quarters three other memory makers set records. Spending at replacement level only. FCF margin reached −64.7% in 2023. Same country exposure as Winbond — both Taiwan-based. Nanya filings FY25
Winbond
NOR Flash · SLC NAND · DRAM
Capex ÷ plant dep0.53×
Revenue vs own peak−19.5%
Capital spending hit 4.59× depreciation in 2022 then fell to 0.53× — about half of replacement. Three consecutive negative FCF years. R&D at six-year high — reads as a completed build. Holds #1 NOR Flash, #3 SLC NAND position. Winbond filings FY25
Key signal — Micron Q3 FY26 investor transcript
"Many projects and platforms and several customers are going to just end up using one or two HBM suppliers… HBM we see is going to become a two-supplier market, and oftentimes, just a single-sourced opportunity. It is not just true for HBM."
Sumit Sadana, EVP and Chief Business Officer, Micron · Q3 FY26 investor transcript Micron Q3 FY26
The co-engineering required for next-generation LPDDR6 and advanced memory at automotive grade means supplier selection increasingly becomes a single or dual-source commitment for the programme's life. The filing tells you whether the supplier you are co-engineering with is still funding the node you need.
Sample output · Technology investment signal · Analog & Power
Analog & Power: technology shifts already in the filings
SiC is replacing IGBT in traction inverters. GaN is entering automotive for the first time. The SDV/zonal architecture is rewriting the MCU BOM. These are not roadmap statements — they are production and design-win disclosures in filings from the last two quarters, with capital spending and management commentary that shows which suppliers are still behind the technology and which are redirecting investment elsewhere.
Semiconductor content per car — the shift already under way
IFX estimate: semiconductor BOM per vehicle by powertrain type Management estimate
BEV 2030 · estimate
~$1,600 (up to $2,500 high-end)
Infineon estimate based on S&P E/E & Semiconductor Service dataset. IFX Q1 FY26 ppt
Technology transitions — production and qualification disclosures, last two quarters
What is shipping or in qualification — sourced from filings and transcripts
Si IGBT
→
SiC MOSFET
IFX SiC trench gives 30% more die per wafer vs planar. CoolSiC Gen2 rated 175°C. Design wins confirmed in traction inverter, OBC, DC-DC. IFX Q1/Q2 FY26
Si MOSFET
→
GaN (auto)
IFX launched first AEC-Q101-qualified GaN: CoolGaN 100V G1. Targets 48V/12V DC-DC, zone control, OBC, Class D audio. IFX Q1 FY26
Domain ECU
→
Zonal / Central
IFX design win for zone controller combining AURIX MCU, PMICs, CoolFET with a leading carmaker. BoM potential ~$500 per E/E architecture. IFX Q3 FY26
SiC (auto)
→
AI datacenter
STM raised FY26 datacenter guidance to "well above $2 billion." AWS multi-year engagement covers SiC power. Catania SiC capacity being allocated. STM Q2 FY26 · July ppt
IFX — AI power supply-limited
IFX stated its €1.5B AI power revenue target for FY26 is "supply-limited, not capped by demand." Dresden M4 — largest intelligent power fab globally — opened July 2026 but AI programmes are filling capacity. Automotive buyers should initiate LTA discussions now. IFX Q1 FY26
STM — dual supply chain now operating
First STM32 wafers produced at Huahong (China) delivered to Chinese customers in Q1 FY26. STM is operating parallel China-for-China and global supply chains. Verify which supply chain your part numbers are on. STM Q1 FY26
⚠ Design-in risk: SiC for automotive 2027+
Both IFX and STM — the two largest automotive SiC suppliers — are allocating fab capacity to AI datacenter programmes simultaneously with automotive ramps. STM's Catania SiC capacity is partially committed to its AWS engagement. IFX's Kulim 3 fills first with AI-related programmes. Engineers designing SiC into OBC, DC-DC, or traction inverter platforms targeting 2027+ production should confirm allocation status with procurement now — not at SOP minus 12 months. STM Q2 FY26 · IFX Q1 FY26
Sample output · Negotiation intelligence
Power semiconductors: your leverage depends on which product you are buying from which supplier.
All three suppliers sent price increase letters in 2026. The financial justification behind each letter is very different — and so is the right response. SiC and IGBT are structurally bifurcated markets sitting inside the same supplier relationship.
Financial position — Q2 2026 · sourced from company filings and earnings transcripts
InfineonBroadest portfolio · Kulim SiC ramping
STMicroP&D loss-making · Catania SiC ramp
onsemiExited commodity · Differentiation focus
| Operating margin |
~20%Segment result target · recovering |
−21.4%P&D segment · loss-making Q2 FY26 |
20.8%Non-GAAP · expanding +170bps Q/Q |
| LTM free cash flow margin |
~9–10%Solid · Dresden M4 capex normalising |
~2–3%Minimal · factory underloaded |
24.2%Strongest of the three · 100% returned to shareholders |
| CapEx intensity |
~12%Kulim 3 + Dresden M4 investment |
~17%Declining toward replacement · build complete |
5.7%Sharply reduced · no new fabs · brownfield only |
| Price increase status |
July 2026 announcedBroad portfolio · AI power fully allocated |
ImplementingMargin recovery driven · P&D needs volume |
Second round"Surgical" where allocation exists · cost pass-through |
Buyer leverage by product category — higher score = higher buyer leverage
Product category
INFINEON
STMICRO
ONSEMI
SiC MOSFETTraction inverter · OBC · DC-DC · AI datacenter
● Low leverage
Supply-limited. AI power absorbing Kulim 3 capacity. Initiate LTA now.
◆ Medium — declining
AWS engagement absorbing Catania SiC. Get written 2027 allocation commitments now.
● Low leverage
CEO: "we exit commodity." China SiC +60–70% YoY. Lead times extending.
IGBT / Si PowerLegacy drivetrain · Industrial drives · General power
◆ Moderate leverage
IFX deprioritising Si drivetrain as SiC displaces. Use in pricing renewal.
▲ Highest leverage
P&D loss-making. Factory needs volume. Best window across all three.
◆ Some leverage
Not exiting IGBT. Pricing actions are cost pass-through, not margin-driven.
What management said — verbatim from earnings transcripts
Infineon · Q1 FY26 earnings call
"Our AI power target of €1.5 billion is supply-limited — it is not capped by demand."
IFX management · Q1 FY26 transcript
STMicro · July 2026 investor ppt
"Data center revenues are now expected well above $2 billion in 2026" — raised from $1B+ guided in Q1 FY26.
STM management · July 2026 investor ppt
onsemi · Deutsche Bank conf. Q2 FY26
"If it's a multi-source product, the margin is not exciting — that's the business we actually exited. We win where our products provide differentiation."
Hassane El-Khoury, CEO · Deutsche Bank conf. Q2 FY26
The procurement read
The power semiconductor market is structurally bifurcated. SiC is supply-constrained across all three suppliers — limited buyer leverage, price increases being implemented, lead times extending at onsemi. Legacy IGBT and Si power has genuine negotiation room — particularly at STM where P&D is loss-making and the factory needs volume. All three are implementing price increases but the financial justification varies dramatically. Knowing which story you are negotiating against changes the conversation entirely. IFX Q1/Q2 FY26 · STM Q2 FY26 · July ppt · onsemi Q2 FY26 transcript · Deutsche Bank conf.
Sample output · Spend + corpus combined
When engineering commits, here is what procurement sees.
Semitrical combines the supplier corpus with a buyer's own spend data. The output connects design-in decisions to negotiation posture, pricing signals, and supplier financial health in one place.
Supplier leverage index — derived from financial signals and management commentary in the corpus · higher score = higher buyer leverage
STM
4.5/5
P&D OPM −21.4% · FCF 2.2%
TI
3.5/5
Inventory 209d · CapEx peak done
IFX
2.5/5
AI supply-limited · Dresden M4
NXP
1.9/5
Recovering · CapEx 0.71× dep
ADI
1.8/5
FCF 38.8% · pricing up
↓ Part numbers, spend figures, and ASP changes below are illustrative sample data. Leverage scores and supplier signals above are sourced directly from the corpus.
Part-level view — corpus intelligence combined with buyer spend data
| Part / Application | Supplier | FY26 Spend | Contracted Δ ASP | Alt Supplier | Posture |
| STPMIC25MPU Power · Industrial | STM | $2.80M | −7.9% | TI TPS6594 ✓ | Push further |
| STM32H7Instrument Cluster · Auto | STM | $3.35M | −8.0% | NXP S32K3 (in prog) | Lock in + volume |
| TPS62913Buck Converter · Auto | TI | $4.51M | −3.5% | STM ST1S12 ✓ | Multi-year LTA now |
| SCTW100N65OBC / DC-DC SiC · Auto | STM | $3.51M | −7.1% | IFX IMBG65R ✓ | Secure 2027 allocation |
| TC375 AURIXPowertrain ECU · Auto | IFX | $4.29M | Flat | NXP S32K3 (not started) | Resist increases |
| IPT015N10N5Motor Drive MOSFET · Auto | IFX | $8.78M | −3.6% | STM STL160N ✓ | Hold — IFX deprioritising Si |
Sample recommendation — STM Power & Discrete
Pricing & terms · grounded in financial signals and management commentary from the corpus
STM's Power & Discrete segment operated at −21.4% operating margin in Q2 FY26 STM Q2 FY26 results and free cash margin was approximately 2.2%. The segment needs volume. STM has already moved −8% on MCU lines to retain volume. Use the NXP S32K3 qualification in progress as a credible walk-away signal. On SiC, request written 2027 allocation commitments before STM's datacenter revenue guidance rises further — at that point their Catania capacity posture changes. STM July 2026 investor ppt
⏱ Watch trigger: STM gross margin above 37% GAAP removes the leverage — guided ~34.8% GAAP in Q2 FY26
S
Semitrical
Get better deals, steadier supply through shared facts with your semiconductor suppliers.
Before your next
design-in review,
ask us for a read.
Supplier names only. No contract. No NDA.
We read every filing, every earnings transcript, and every investor presentation across our supplier corpus — and translate it for the people who design components in, and the people who then have to buy them.
What you get
Supplier Portfolio Diagnostic
Your shortlisted or current suppliers. Their last two quarters of filings. What it means for technology longevity, supply continuity, and pricing posture — combined with your spend data if you share it. Delivered as a structured report your engineering and procurement teams can use the same week.
Sources
10-K · 10-Q · 8-K · earnings transcripts
investor presentations · company IR filings
Public documents only.
Coverage
Semiconductor suppliers tracked across all filings
Memory · Analog · Power · Discrete
Updated each quarter as suppliers file
Position as at September 2026. Each supplier's figures change when it next files. Sources: public company filings — SEC 10-K/10-Q/8-K, company IR press releases, earnings transcripts, investor presentations. Management estimates labelled throughout. May be forwarded and shared freely.